This is Local 213’s work information for Friday, April 10th, 2026.

The 1st call is for Cam at Irving Oil Refinery; they require:

*1 Journeyman Pipefitter for Days *2 Journeyman Pipefitters for Nights *1 F3/F4 Welder to test on F3/F4; F6/F5 for Nights.

Starting Sat. April 25th at 7:30am for day shift and 7:30pm for night shift, the shift schedule is 6×10’s with possible overtime. The duration is unknown. This call will have a 2-break shift. This work is under the GPMA Agreement under short-term conditions. Individuals will be required to take fresh air training. Everyone will start on day shift for the fresh air training, and then night shift will switch to nights. Must be clean-shaven and fit-tested and must have all safety training up-to-date and must complete all orientation and hire-on paperwork before reporting to the site. A D&A test is required. 

The 2nd call is for Cam at Irving Oil Refinery; they require:

*1 F3/F4 Welders to test on F3/F4; F6/F5 for Days & *2 F3/F4 Welders to test on F3/F4; F6/F5 for Nights.

Starting Sun. April 26th at 7:30am for day shift and 7:30pm for night shift; the shift schedule is 6x10s with possible overtime. The duration is unknown. This call will have a 2-break shift. This work is under the GPMA Agreement under short-term conditions. Must be clean-shaven and fit-tested and must have all safety training up-to-date and must complete all orientation and hire-on paperwork before reporting to the site. A D&A test is required. 

Any local members interested in these calls, please contact the hall Monday morning between 8 and 10am.

Thank you, have a great evening!