This is Local 213’s Work Information for Friday, March 22nd.
The Weld shop is open by appointment only. Please contact Jamie Profit (506) 333-8542 to make an appointment.
1st call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:
*3 Journeyman Pipefitters
Starting Monday, March 25th at 7:00am. Duration is 3 weeks plus and they are working 4×10’s Mon-Thurs with possible overtime. This work is under the NMA. Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required. All Orientation MUST BE COMPLETED before arriving on site.
2nd call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:
*1 Journeyman Pipefitter, 3 F3/F4 Welders to test on F3/F4, F6/F5
Starting Monday, April 15th at 7:00am. Start on days then switch to nights April 22nd for shutdown. Duration is 16 shifts plus and they are working 4×10’s switching to 6×10’s with at least one weekend being worked straight through. Planned shift is 10 hour days with 12’s as needed to expedite critical path. This work is under the Short Term NMA. Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required. All Orientation MUST BE COMPLETED before arriving on site.
3rd call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:
*5 Journeyman Pipefitters, 2 Apprentice Pipefitters
Starting Tuesday, April 23rd at 7:30am. Duration is 16 shifts plus and they are working 6×10’s with at least one weekend being worked straight through. Planned shift is 10 hour days with 12’s as needed to expedite critical path. This work is under the Short Term NMA. Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required. All Orientation MUST BE COMPLETED before arriving on site.
4th call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:
*6 Journeyman Pipefitters
Starting Tuesday, April 23rd at 7:30pm. Duration is 16 shifts plus and they are working 6×10’s with at least one weekend being worked straight through. Planned shift is 10 hour days with 12’s as needed to expedite critical path. This work is under the Short Term NMA. Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required. All Orientation MUST BE COMPLETED before arriving on site.
5th call is for CAM at Irving Oil Refinery – Report to Access Building off Lochlomond Road, they require:
*2 Journeyman Pipefitters, 1 F3/F4 Welder to test on F3/F4
Starting Monday April 1st at 5:30pm. Duration is unknown and they are working 4×10’s with possible overtime. This work is under the GPMA Long Term. Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug and Alcohol test is required. All Orientation MUST BE COMPLETED before reporting to site.
Any local members interested in these calls, please contact the hall Monday morning between 8-10am.
Thank You & Have a Great Weekend!