Dispatch

Dispatch2026-07-13T14:52:54+00:00

Monday, March 25th

This is Local 213’s Work Information for Monday, March 25th

The Weld shop is open by appointment only. Please contact Jamie Profit (506) 333-8542 to make an appointment.

1 call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:

*3 Journeyman Pipefitters

Starting Monday, March 25th at 7:00am.  Duration is 3 weeks plus and they are working 4×10’s Mon-Thurs with possible overtime.  This work is under the NMA.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required.  All Orientation MUST BE COMPLETED before arriving on site.

Any local members interested in this call, please contact the hall Tuesday morning between 8-10am.

Thank You & Have a Great Evening!

Friday, March 22nd

This is Local 213’s Work Information for Friday, March 22nd.

The Weld shop is open by appointment only. Please contact Jamie Profit (506) 333-8542 to make an appointment.

1st call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:

*3 Journeyman Pipefitters

Starting Monday, March 25th at 7:00am.  Duration is 3 weeks plus and they are working 4×10’s Mon-Thurs with possible overtime.  This work is under the NMA.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required.  All Orientation MUST BE COMPLETED before arriving on site.

2nd call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:

*1 Journeyman Pipefitter, 3 F3/F4 Welders to test on F3/F4, F6/F5

Starting Monday, April 15th at 7:00am.  Start on days then switch to nights April 22nd for shutdown.  Duration is 16 shifts plus and they are working 4×10’s switching to 6×10’s with at least one weekend being worked straight through.  Planned shift is 10 hour days with 12’s as needed to expedite critical path.  This work is under the Short Term NMA.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required.  All Orientation MUST BE COMPLETED before arriving on site.

3rd call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:

*5 Journeyman Pipefitters, 2 Apprentice Pipefitters

Starting Tuesday, April 23rd at 7:30am.  Duration is 16 shifts plus and they are working 6×10’s with at least one weekend being worked straight through.  Planned shift is 10 hour days with 12’s as needed to expedite critical path.  This work is under the Short Term NMA.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required.  All Orientation MUST BE COMPLETED before arriving on site.

4th call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:

*6 Journeyman Pipefitters

Starting Tuesday, April 23rd at 7:30pm.  Duration is 16 shifts plus and they are working 6×10’s with at least one weekend being worked straight through.  Planned shift is 10 hour days with 12’s as needed to expedite critical path.  This work is under the Short Term NMA.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required.  All Orientation MUST BE COMPLETED before arriving on site.

5th call is for CAM at Irving Oil Refinery – Report to Access Building off Lochlomond Road, they require:

*2 Journeyman Pipefitters, 1 F3/F4 Welder to test on F3/F4

Starting Monday April 1st at 5:30pm.  Duration is unknown and they are working 4×10’s with possible overtime.  This work is under the GPMA Long Term.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug and Alcohol test is required.  All Orientation MUST BE COMPLETED before reporting to site.

Any local members interested in these calls, please contact the hall Monday morning between 8-10am.

Thank You & Have a Great Weekend!

Thursday, March 21st

This is Local 213’s Work Information for Thursday, March 21st.

The Weld shop is open by appointment only. Please contact Jamie Profit (506) 333-8542 to make an appointment.

There will be a Fall Protection course held at the hall on Saturday, March 23rd.  Any members who are in need of this please contact the hall to register.

1st call is for Lorneville at Irving Pulp & Paper (West), they require:

*1 Journeyman Pipefitter

Starting Monday, March 25th at 7:00am.  Duration is 3 months and they are working 4×10’s Mon-Thurs.  This work is under the Industrial Agreement. Must be clean shaven and fit tested, must have all safety training up to date. All Orientation and Hire on documents MUST BE COMPLETED before arriving on site.

2nd call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:

*3 Journeyman Pipefitters

Starting Monday, March 25th at 7:00am.  Duration is 3 weeks plus and they are working 4×10’s Mon-Thurs with possible overtime.  This work is under the NMA.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required.  All Orientation MUST BE COMPLETED before arriving on site.

3rd call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:

*1 Journeyman Pipefitter, 2 Apprentice Pipefitters, and 3 F3/F4 Welders to test on F3/F4, F6/F5

Starting Monday, April 15th at 7:00am.  Start on days then switch to nights April 22nd for shutdown.  Duration is 16 shifts plus and they are working 4×10’s switching to 6×10’s with at least one weekend being worked straight through.  Planned shift is 10 hour days with 12’s as needed to expedite critical path.  This work is under the Short Term NMA.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required.  All Orientation MUST BE COMPLETED before arriving on site.

4th call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:

*5 Journeyman Pipefitters, 2 Apprentice Pipefitters

Starting Tuesday, April 23rd at 7:30am.  Duration is 16 shifts plus and they are working 6×10’s with at least one weekend being worked straight through.  Planned shift is 10 hour days with 12’s as needed to expedite critical path.  This work is under the Short Term NMA.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required.  All Orientation MUST BE COMPLETED before arriving on site.

5th call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:

*6 Journeyman Pipefitters, 1 Apprentice Welder

Starting Tuesday, April 23rd at 7:30pm.  Duration is 16 shifts plus and they are working 6×10’s with at least one weekend being worked straight through.  Planned shift is 10 hour days with 12’s as needed to expedite critical path.  This work is under the Short Term NMA.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required.  All Orientation MUST BE COMPLETED before arriving on site.

6th call is for CAM at Irving Oil Refinery – Report to Access Building off Lochlomond Road, they require:

*2 Journeyman Pipefitters, 2 F3/F4 Welders to test on F3/F4

Starting Monday April 1st at 5:30pm.  Duration is unknown and they are working 4×10’s with possible overtime.  This work is under the GPMA Long Term.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug and Alcohol test is required.  All Orientation MUST BE COMPLETED before reporting to site.

Any local members interested in these calls, please contact the hall Friday morning between 8-10am.

Thank You & Have a Great Evening!

Wednesday, March 20th

This is Local 213’s Work Information for Wednesday, March 20th.

The Weld shop is open by appointment only. Please contact Jamie Profit (506) 333-8542 to make an appointment.

There will be a Fall Protection course held at the hall on Saturday, March 23rd.  Any members who are in need of this please contact the hall to register.

1st call is for Lorneville at Irving Pulp & Paper (West), they require:

*1 Journeyman Pipefitter

Starting Monday, March 25th at 7:00am.  Duration is 1 month and they are working 4×10’s Mon-Thurs.  This work is under the Industrial Agreement. Must be clean shaven and fit tested, must have all safety training up to date. All Orientation and Hire on documents MUST BE COMPLETED before arriving on site.

2nd call is for Lorneville at Irving Oil Refinery – Gate 8 (Turn Around Complex 2), they require:

*3 Journeyman Pipefitters

Starting Monday, March 25th at 7:00am.  Duration is 3 weeks plus and they are working 4×10’s Mon-Thurs with possible overtime.  This work is under the NMA.  Must have all safety training up to date, be able to climb and work at heights, be clean shaven and fit tested and a Drug & Alcohol test is required.  All Orientation MUST BE COMPLETED before arriving on site.

Any local members interested in these calls, please contact the hall Thursday morning between 8-10am.

Thank You & Have a Great Evening!

Tuesday, March 19th

This is Local 213’s Work Information for Tuesday, March 19th.

The Weld shop is open by appointment only. Please contact Jamie Profit (506) 333-8542 to make an appointment.

There will be a Fall Protection course held at the hall on Saturday, March 23rd.  Any members who are in need of this please contact the hall to register.

1st call is for CAM at the Irving Oil Refinery (Gate 8), they require:

*1 Journeyman Pipefitter

Starting Monday April 1st at 7:30am.  Duration is unknown and they are working 4×10’s with possible overtime.  Must have all safety training up to date, be able to climb and work at heights, pass Irving security clearance, be clean shaven and fit tested and a D&A test is required.  All Safety and Orientation MUST BE COMPLETED before arriving on-site.  This work is under the GPMA – Long Term.

2nd call is for Lorneville at Irving Pulp & Paper (West), they require:

*1 Journeyman Pipefitter, 1 F3/F4 Welder to test on Carbon Stick and Stainless Tig (Weld test Thursday, March 21st at the hall)

Starting Monday, March 25th at 7:00am.  Duration is 1 month and they are working 4×10’s Mon-Thurs.  This work is under the Industrial Agreement. Must be clean shaven and fit tested, must have all safety training up to date. All Orientation and Hire on documents MUST BE COMPLETED before arriving on site.

Any local members interested in these calls, please contact the hall Wednesday morning between 8-10am.

Thank You & Have a Great Evening!

Monday, March 18th

This is Local 213’s Work Information for Monday, March 18th.

The Weld shop is open by appointment only. Please contact Jamie Profit (506) 333-8542 to make an appointment.

There will be a Fall Protection course held at the hall on Saturday, March 23rd.  Any members who are in need of this please contact the hall to register.

1st call is for Lorneville at the Irving Pulp and Paper Mill, they require:

*1 Journeyman Pipefitter

Starting Tues. March 19th at 7:00am, will be working 4×10’s Mon-Thurs. Duration is 2-3 weeks plus.  This work is under the Industrial Agreement.  This job will require lots of heavy lifting of 10″ hose to be disconnected and removed. Must be clean shaven and fit tested, must have all safety training up to date.  All orientation MUST BE COMPLETED before arriving on-site.

2nd call is for Lorneville at the Irving Oil Refinery (Gate 8 – Turnaround Complex 2), they require:

*1 Journeyman Pipefitter

Starting on Days Monday March 25th at 7:00am for pre-outage will be working 4×10’s until April 22nd then will be switching to Nights on April 22nd for the duration of the outage, approx. 16 shifts of 6×10’s, with a possibility of 7-10’s or 12’s on critical path work during the outage.  This work is under the NMA Short Term Agreement for the duration of the call, till the end of the outage.  Must be clean shaven and fit tested, must have all safety training up to date. Must be able to climb and work from heights. All Safety and Orientation MUST BE COMPLETED before arriving on-site and a D&A test is required.

3rd call is for CAM at the Irving Oil Refinery (Gate 8), they require:

*4 Journeyman Pipefitters, 2 Apprentice Pipefitters & 2 F3/F4 Welders to test on F3/F4

Starting Monday April 1st at 7:30am.  Duration is unknown and they are working 4×10’s with possible overtime.  Must have all safety training up to date, be able to climb and work at heights, pass Irving security clearance, be clean shaven and fit tested and a D&A test is required.  All Safety and Orientation MUST BE COMPLETED before arriving on-site.  This work is under the GPMA – Long Term.

Any local members interested in these calls, please contact the hall Tuesday morning between 8-10am.

Thank You & Have a Great Evening!

UA Local 213 Saint John

United Association of Journeymen and Apprentices of the Plumbing and Pipe Fitting Industry of the United States and Canada

WE DO IT RIGHT THE FIRST TIME!

NOTICE TO ALL UA LOCAL 213 MEMBERS

Regular Monthly Meeting

August 12TH @ 7 PM

Royal Canadian Legion Branch 69
714 Wilson Street, West Saint John

Your Pledge:
“I further pledge that I will faithfully attend all meetings of the local union unless prevented by sickness or other causes beyond my control.”

U.A. MEMBERSHIP CARDS ARE REQUIRED TO GAIN ACCESS TO THE MONTHLY MEETING

351 King William Road
Saint John, N.B. E2M 7C9
Phone No. (506) 635-1605
Fax No. (506) 635-8450

Go to Top